As you can see we have decided to put ourselves through another remodeling project. Hopefully this won’t take as long as the bathroom.
Here are Day 1 photos of our END of YEAR Kitchen Remodel!![](http://farm3.static.flickr.com/2073/2140422492_260eaef2b9.jpg?v=0)
![](http://farm3.static.flickr.com/2073/2140422492_260eaef2b9.jpg?v=0)
We are:
- Taking out the cabinet beneath the old stovetop hole and going to place the oven there.
- Replacing the countertops.
- Painting the cabinets white.
- Replacing the backsplash.
- Installing a floor cabinet.
- Replacing the peel and stick floor with ceramic tile.